How To Level A Shed On Uneven Ground
You can check the level by using an 8 2 4 and a level.
How to level a shed on uneven ground. Note jump to step 3if your site is more than 12 off level over an 8 span. Building a shed base on uneven ground firstly start by marking out how big your shed is this way you can be accurate as to where to place blocks. If you re making a shed from scratch decide the measurements you want for your shed. Uneven ground makes doors stick and affects the stability of your shed.
Use posts and position in the square using ribbon to keep in line. This will usually be your starting point and the rest of the ground will be brought to here but you can also lower some ground if that makes more sense for your project. Start from one side and screw the base on top of the timber panels. Find the measurements for the base of your shed on the side of the packaging.
Mark out the area of your shed base using wooden stakes. Attach a string level to the strings to determine the high point. Never set a shed where it might act as a dam to build up water behind it or where a heavy flow might wash foundation support away. Use a string level.
Fill the hole with pea gravel so you have a flat surface area. A foundation lifts your shed off the ground. It provides a stable and level base so the doors open and your shed lasts longer. Take your spade and gently dig the top layer attempting to get the ground as flat as possible.
If the 2 4 is level and the one end of the 2 4 is more than 12 off the ground then you should proceed to step 3. As soon as you the shed base is level you can start to add your shed base on top. Use a measuring tape to mark out this area on the ground. Elevate the floor above any uneven shed site so there is good drainage under it whether it is a wood floor or metal.
Attach strings to stretch between the stakes a few inches above the ground. How to level the ground 1 first of all you need to mark out the area this area should be the total size of your chosen plastic shed base bearing in mind our shed base panels are 13 square. Place the one end of the 2 4 at the highest corner of the site and place the level on top. Move the shed location if the uneven site is an area of heavy water runoff.